2010 With the upper addition gutted, the hall was the last area to be completed. All the old paneling was taken down and the hall was wired for emergency lighting as well as outlets. Thanks to the undergrads the hallway was plywooded and drywalled. The mudding crew quickly followed completing the rest of the upper addition at the same time and carpet was installed before B section move in. With the “All American” Upper addition completed its was time to move downstairs.