12/20/2011
With the three lower addition rooms wired and near completion the lower addition hallway was gutted. This area needed some attention for a number of years. The wood paneling was run down and the radiator baseboards were still in use because rerouting needed to be done through the walls. The hallway was rewired and ply wooded and drywalled like every other room. Also a smoke detector and pull handle was installed in addition to emergency lighting to comply with current codes.