1/20/2009 Even though the country club got a minor face lift with the renovation of the OQ bathroom it still needed to be renovated. With the completion of the Nursery the next project on the action plan was the CC. On 12/6/2008 the CC was gutted in the hopes that it would completed by the time A section moved in in January. The CC is now arranged differently than before and features a built in audio/video components as well as surround sound. Also since the OQ bath wall was opened up the plumbing was accessed to put a sink into the main house closet for mop bucket filling.