6/20/2013 Now that the interior of the addition has been fully renovated it was time to look at the exterior. With the roof complete in 2009 thanks to the help of many alumni all that was left was the siding. The flashing around the windows proved to not be robust and the paint was chipping of the old Redwood siding. It was decided that new siding should be installed to match the main house. Along with the siding now the French doors could be installed on the BMA. Unfortunately the existing deck was too high which would have cause a step up to the deck so we decided we would rebuild it taking special consideration into the view from the BMA. Siding is due to be completed by the end of October 2012 and hopefully the deck should be in place by the end of November.