Cafeteria ’16

7/29/2016
The cafeteria had been put off for years since it was a Segway for wiring and plumbing to the addition. The drop ceiling was removed several years prior and we were still utilizing the radiators for heating this area. The wood paneling was dated and a refresh was needed. We gutted everything and decided to install a new air handler so we could add AC to the café. All lighting was upgraded to LED and wires were run in the walls to power speakers and a projectors to keep everything clean and concealed. The result looks fabulous and the undergraduate brothers are very appreciative.