12/20/2014 The addition bathroom had never been updated since it was added in the 80’s. The urinal had been having draining issues for several terms and the 2 shower/3 sink arrangement was not fully utilized. The entire room was gutted and much of the floor was dug out to install new plumbing for the new layout. 3 showers were installed, 2 pedestal sinks, a toilet and a urinal. All electrical was upgraded included LED lights. The bathroom is a lot more functional now and the undergrads agree.