BMA ’13

6/25/2013
For the longest time the BMA has been a preferred room in the addition mainly because of the deck. This has always been a bonus but has not been fully taken advantage of because it was an addition after the addition was built. That being said undergrads would have to crawl through a window to get to it. It was decided that this was to come to an end and French doors were purchased. After a long time coming the French doors were installed in October 2012 and the BMA project continued on its way. Thanks to the B section undergrads the room was painted and is now just awaiting a ceramic tile floor due to the traffic it will see. It is expected to be livable Spring 2013