12/20/2004 During project weekend a minor floor replacement of the OK John was going to take place. The further we got into the project though the more we realized it needed more than just a face lift. The bathroom was gutted, insulated, rewired, plywooded drywalled and got a new floor as well as all new components. In addition to the renovation the bathroom was equipts with commercial dispensors for soap, paper towels, and toilet paper.